If you are operating a
Besser PV-1 or PV-2 SmartPac, please be sure to update the information in
your manuals as follows.
PV-1
manual: page A-1
PV-2 manual: page 37
Previous
Statement:
NOTE:
This conflicts with current installation procedures.
2.
After checking correct hub position, handtighten three or four equally
spaced locking screws till initial contact is established.
3.
Use torque wrench and set it approximately 5% higher than specified
tightening torque Ma. See Table 1. Torque screws in either a clockwise
or counter clockwise sequence, using only 1/4 turns for several passes
until 1/4 turns can no longer be achieved.
Replace with the
following statement:
NOTE:
This conflicts with
current installation procedures.
2. After checking correct hub position, handtighten three or four equally
spaced locking screws until initial contact is established.
3. Use torque wrench to tighten SmartPac sheaves to 18 lb-ft [24 N•m].
Torque screws in either a clockwise or counter clockwise sequence, using
only 1/4 turns for several passes until 1/4 turns can no longer be
achieved.
IMPORTANT: Torque
bolts on the SmartPac sheaves to 18 lb-ft [24 N•m].
Failure to comply will result with rotary union
failures.